Featured major projects illustrating the challenges our expert teams have managed. We are pleased to have been the contractor of choice for a wide variety of projects in our decades in business.
Specialized Services
Lake Excavating has an extensive resume with conventional dam construction, one highlighted background in Hydraulic Sand Cell Dam Construction. Sand Cell Dam Construction is the usage of mill tailings(waste), left over from the mineral extraction process, for dam construction. Lake Excavating successfully placed over 8,000,000m3 of hydraulic sand in 16 months of 24hr construction. This volume and timeline broke every production record the mine owner had since its inception in the 1960’s, once again proving our ability to overcome any challenge.
- 955m of Watermain plus the installation of fittings, hydrants & valves
- 850m of HDPE Sanitary Forcemain
- 550m of Storm Pipe & Associated Catch Basins & Sluice Gates
- 1160m of Gravity Sanitary System plus all associated manholes
Athabasca Flats Phase 1 Single Family Site
In September of 2015, Lake Excavating Ltd. was contracted to build 27 new single family lots in Whitecourt, AB. The project began with the installation of the deep utilities and services to each individual lot. Once the deep utilities were installed, Lake Excavating Ltd. was required to bring in over 40,000 cubic meters of import fill material to raise the site to the proper grade levels. Once the site was lifted, the installation of the subgrade granular base, curbs, sidewalks and boulevards were completed. Lake Excavating Ltd., finished the project by paving the roads and approaches for completion. Avion Developments, a sister company of Lake Excavating Ltd. is now selling the lots.
Coyote Rock Frontage Road and Subdivision Development
For this Project, Lake Excavating Ltd. partnered up with the Williams Lake Indian Band to begin the construction of the Coyote Rock Frontage Road and Subdivision. Beginning in August 2015, Lake Excavating Ltd. began the dirt work and common excavation required to build the base of the project. The project required Lake Excavating Ltd. to cut and fill over 150,000 cubic meters of common excavation to build subbase for the frontage road and subdivision.
In late October, the underground utility installation began with over:
- 1,300 meters of watermain,
- 955 meters of high pressure sanitary forcemain
- 850 meters of gravity sanitary sewer
- 10 commercial services
- 28 residential services
- 6 highway crossings